Wind Energy Certificate for the month JANUARY 2015 have been uploaded.more
Invoices for SLDC charges for the month December 2014 have been uploaded.....more
Honourable CERC has issued - Deviation Settlement Mechanism & related matter regulation 2014 - vide order dtd.07.01.2014. The above regulation is effective from dtd.17.02.2014. Appropriate changes in this regards, will be applicable to intra-state entities. more
Honorable GERC has issued Terms & conditions of Inter state open access first amendment Regulation 2014 vide order dated 04.03.2014 The above regulation will be effect from 01.04.2014more
On 11th October 2014 ever highest in Gujarat maximum demand catered 14004 MW at 15:00 hrs and energy 311 Mus achieved with support of all stake holder in Gujarat power system.more
Invoices for STOA Transmission charges for the FY-13-14 Have been uploadedmore
Revised wind energy certificates of suthri and nani-sinthodi for the month april,may and june 2014more
Wind Energy Certificate for the month NOVEMBER 2014 for the pooling station Chandrodi(RRB),Lamba,Bhogat,Navadara,Patelka,Meravdar,Dhank have been uploaded.more
GRID CONNECTION CHARGES : SLDC has raised invoices for its claim of Grid Connection Charges (one time) for connecting to the Grid. These charges are as per GERC Regulation 5 of 2005 Chapter 3, Section 3/(i).more
SLDC Engineers participated in a theme dance during the 6th Annual Day function held on 16.01.2015 on the eve of Republic Day.more
REVISED UI ACCOUNTS Week 19,20, 21, 22, 23 and 24 (from 05.08.2013 to 15.09.2013) have been uploaded.more
Petition in the matter of Devising a mechanism for recovery of compensatory charges from entity (ies) who are in deviation to schedule and for whom a generating station of any entity is scheduled by State Load Dispatch Centre to ensure over drawl / under drawl at Regional periphery as stipulated by Central Commission.more
Provisional UI Week No.07 from 19/05/2014 to 25/05/2014 REV-0 has been uploaded.more
Provisional UI Week No.08 from 26/05/2014 to 01/06/2014 REV-0 has been uploaded.more
REC Week No.08 from 26/05/2014 to 01/06/2014 has been uploaded.more
corner corner
Smt. Anandiben Patel, Hon'ble
Chief Minister,Guj.
Shri Saurabh Patel,
Hon'ble Energy Minister,Guj.
State Load D0patch Centre (SLDC)
 

Grid Frequency:50.06 Hertz

    

Gujarat Catered: 9899 MW

 
left navi top bg
left navi bottom bg
photo
contact top
 

Contact Information

State Load Despatch Center
Gujarat Energy Transmission Co. Ltd.
132kV Gotri Sub Station Compound,
Near TB Hospital Gotri Road,
Vadodara 390021, Gujarat, INDIA
phone +91-265-2352103,2322206
Visiting Hours : 16:00 To 18:00 
   
contact bottom
 
Gujarat Power System - Real-time Data
 
State Load D0patch Centre (SLDC)-Real-time System Data

Gujarat Power System - Real-time Data

           17:20:20 05-03-15                                     50.03 Hz    DSM Rate(Rs./Unit): 1.07
Station Name Installed Capacity Schedule Generation Name Schedule Drawal DSM
Ukai(1-5)+Ukai6 850+500 293,336 326 + 360 Gujarat At periphery 2143 2471 327
Wanakbori 1470 434 , 144 625 DGVCL 1940 2212 272
Gandhinagar 870 282 , 154 481 MGVCL 1110 1052 -63
Sikka 240 80 81 UGVCL 2188 2214 23
KLTPS(1-3)+KLTPS4 215+75   162 , 41 182 + 103 PGVCL 3021 2919 -97
Utran(Gas)(I+II) 135+375 0 , 0 0+0 TPAECo 433 434 1
Dhuvaran (Gas) 219 0 , 0 0 TPSECo 397    410 12
Ukai  (Hydro) 305   76        
Kadana (Hydro) 242   0 GSECL Total Generation 2187
GIPCL(I+II) 145 (52) +165 79,0 79 +0 Public owned IPP Generation 623
SLPP(I+II) 250+250 109 , 220 131+245 Private IPP Generation 943
Akrimota 250 154 158 Torrent Power 602
GSEG(I) 156 51 9 Gujarat Total Conventional Generation 7415
CLPI 655 0 1 (Wind+Solar) Generation 390 + 222
EPOL 515 (300) 0 0 Gujarat Catered MW 9901
TPAECo 500   303
EPGL(I+II) 1200 (1000) 665 717  
Sugen 1147 300 298     
Adani(I+II+III) 1320(1000)+1320(1000) +1980 (0) 2672

491+448

+1575

 
CGPL 4150   2728  
KAPP 440 (125)   405  
KAWAS 656 (187)   -1  
JHANOR 657 (237)   0  
SSP(RBPH) 1200   266  
SSP(CHPH) 250   96  

Note:
[1] Discom schedul0 are displayed with proportionate wind farm (W/F) generation allocations.
[2] Allocations of CPP, Central Sector and State Generating stations effective from 10-July-2012
[3] Real time data shown on this website are indicative only out of commercial ambit.

50.03 Hz                                 UI Rate(Rs./Unit): 1.07