logo
Revision : 8
Remarks : ISGS R-11,
Fackeedb
left bg right
Wind Energy Certificate for the month JUNE 2014 have been uploaded.more
Invoices for SLDC charges for the month June-2014 have been uploaded.....more
Honourable CERC has issued - Deviation Settlement Mechanism & related matter regulation 2014 - vide order dtd.07.01.2014. The above regulation is effective from dtd.17.02.2014. Appropriate changes in this regards, will be applicable to intra-state entities. more
Honorable GERC has issued Terms & conditions of Inter state open access first amendment Regulation 2014 vide order dated 04.03.2014 The above regulation will be effect from 01.04.2014more
Revised Wind Energy Certificate for the month July 2013 have been uploadedmore
Honorable GERC has issued an order in the petition no. 1302/2013 for the additional surcharge to be payable by OA consumer and which will be effective from 1st April 2014. All OA consumers may take note of this order. more
REC Account Wk. No.42,43,44,45,46(From 13 JAN 2014 TO 16 FEB 2014) have been uploaded.....more
Revision of UI Week No.31 from 28/10/2013 to 03/11/2013 REV-01 has been uploaded.more
Revision of UI for FY 2010-11 from Week No.35,36,37,38,39 & 40 i.e from date 29.11.2010 to 09.01.2011 Revision 1 have been uploaded.more
Invoices for SLDC charges for Wind Generators for FY-13-14 have been uploaded.more
Clarification on Withdrawal of STOA wef 20.3.2014more
UI Account Wk. No.44 & 45(From 27 JAN 2014 TO 09 FEB 2014) have been uploaded..more
On 29th April ever highest in Gujarat maximum demand catered 13740 MW at 16:00 hrs and energy 304 Mus achieved with support of all stake holder in Gujarat power system.more
UI Account Wk. No.46(From 10 FEB 2014 TO 16 FEB 2014) have been uploaded..more
Invoices for STOA Transmission charges for the month June-2014 Have been uploadedmore
Revision of UI Week No.31 from 28/10/2013 to 03/11/2013 REV-02 and Week No. 32 to 35 from 04/11/2013 to 01/12/2013 has been uploaded.more
Revision of UI Week No.31 from 28/10/2013 to 03/11/2013 REV-02, Revision of UI Week No.32 to 35 from 04/11/2013 to 01/12/2013 REV-01 has been uploaded.more
corner corner
Smt. Anandiben Patel, Hon'ble
Chief Minister,Guj.
Shri Saurabh Patel,
Hon'ble Energy Minister,Guj.
State Load D0patch Centre (SLDC)
 

Grid Frequency:50.03 Hertz

    

Gujarat Catered: 8824 MW

 
left navi top bg
left navi bottom bg
photo
contact top
 

Contact Information

State Load Despatch Center
Gujarat Energy Transmission Co. Ltd.
132kV Gotri Sub Station Compound,
Near TB Hospital Gotri Road,
Vadodara 390021, Gujarat, INDIA
phone +91-265-2352103,2322206
Visiting Hours : 16:00 To 18:00 
   
contact bottom
 
Gujarat Power System - Real-time Data
 
State Load D0patch Centre (SLDC)-Real-time System Data

Gujarat Power System - Real-time Data

           12:50:21 31-07-14                                     50.01 Hz    DSM Rate(Rs./Unit): 1.07
Station Name Installed Capacity Schedule Generation Name Schedule Drawal DSM
Ukai+Ukai6 850+500 150,470 150 + 360 Gujarat At periphery 1629 1479 -150
Wanakbori 1470 289 , 0 319 Dgvcl 2248 2158 -88
Gandhinagar 870 0 , 154 169 Mgvcl 1260 1246 -16
Sikka 240 0 0 Ugvcl 1403 1399 -3
Kutch (Lignite) 290 116 , 60 203 Pgvcl 2386 2274 -112
Utran(Gas)(I+II) 135+375 0 , 0 0+0 Tpae 685 775 89
Dhuvaran (Gas) 219 0 , 0 0 Tpse 456    519 62
Ukai  (Hydro) 305 219 225        
Kadana (Hydro) 242   0 GSECL Total Generation 1426
GIPCL-1 145 (52) 65 66 State owned IPP Generation 598
GIPCL-2 165 0 0 Other IPP Generation 1236
Slpp(I+II) 250+250 215 , 110 219+126 Torrent Power 544
Akrimota 250 151 180 Gujarat Total Conventional Generation 7241
GSEG(I+II) 156+351 0 5+ -83 (Wind+Solar) Generation 381 + 322
CLPI 655 0 1 Gujarat Catered MW 8734
EPOL 515 (300) 0 0
TPAeco 500   251  
EPGL(I+II) 1200 (1000) 1000 1020     
Sugen 1147 300 293  
Adani(I+II) 2640 (2000) +1980 (0) 3030

1234+1804

 
Cgpl 4150   2202  
Gppc 351   0  
Ssp(rbph) 1200   1094  
Ssp(chph) 250   40  

Note:
[1] Discom schedul0 are displayed with proportionate wind farm (W/F) generation allocations.
[2] Allocations of CPP, Central Sector and State Generating stations effective from 10-July-2012
[3] Real time data shown on this website are indicative only out of commercial ambit.

50.01 Hz                                 UI Rate(Rs./Unit): 1.07