logo

Latest News

Procedure for integration of a new network element of a transmission licensee into the grid and issuance of certificate by Regional Load Despatch Centre (RLDC) for successful trial operation of a transmission element.more

Published Date wise UI/DSM Account Summary (From 1st April onwards 2017) more

SLDC Annual report for year 2016-17.more

Invoices for SLDC charges for MAY'18 have been uploaded on SLDC website more

Invoices for RTU Rental for FY 2017-18_Phase-III has been uploaded on SLDC Website more

UI(DEVIATION CHARGES) for the WEEK NO.51 (2017-18) from 19/03/2018 to 25/03/2018 REV-1 has been uploaded.more

Wind Energy Blocked of April 18 for following partiesmore

Reactive Energy Charges (REC) Account for the week No.40 from dt.01.01.2018 to dt.07.01.2018 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.52 (2017-18) from 26/03/2018 to 01/04/2018 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.43 from dt.22.01.2018 to dt.28.01.2018 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.01 (2018-19) from 02/04/2018 to 08/04/2018 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.44 from dt.29.01.2018 to dt.04.02.2018 R0 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.45 from dt.05.02.2018 to dt.11.02.2018 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.02 (2018-19) from 09/04/2018 to 15/04/2018 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.46 from dt.12.02.2018 to dt.18.02.2018 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.03 (2018-19) from 16/04/2018 to 22/04/2018 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.47 from dt.19.02.2018 to dt.25.02.2018 R0 has been uploaded.more

Wind Energy Blocked of May 18 for following partiesmore

Reactive Energy Charges (REC) Account for the week No.48 from dt.26.02.2018 to dt.04.03.2018 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.04 (2018-19) from 23/04/2018 to 29/04/2018 has been uploaded.more

Grid Frequency : 50.08 Hz
     
Gujarat Catered : 14762 MW
Revision : 4
Remarks : ,

Functions

Functions of State Load Despatch Centres as per IEGC 2003.

 

(1) The State Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in a State.

 

(2) The State Load Despatch Centre shall--

 

(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;

 

(b) monitor grid operations;

 

(c) keep accounts of the quantity of electricity transmitted through the State grid

 

(d) exercise supervision and control over the intra-State transmission system; and

 

(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

 

(3) The State Load Despatch Centre may levy and collect such fee and charges from the generating companies and licensees engaged in intra-State transmission of electricity as may be specified by the State Commission.

Please contact sldcscada.getco@gmail.com for technical query related to Website Browsing, Downloading, Uploading.....etc.

Company Visiting Hours
16:00 To 18:00

Website Total Visits
27230476

Visitor Graph
Click & View

Website Last Updated
25-06-2018 03:28:03 PM

Supported Browsers