Latest News

Procedure for integration of a new network element of a transmission licensee into the grid and issuance of certificate by Regional Load Despatch Centre (RLDC) for successful trial operation of a transmission element.more

Published Date wise UI/DSM Account Summary (From 1st April onwards 2017) more

SLDC Annual report for year 2016-17.more

Invoices for SLDC charges for JAN'18 have been uploaded on SLDC website more

Invoices for RTU Rental for FY 2017-18_Phase-II has been uploaded on SLDC Website more

Wind Energy Blocked of December-17 for following partiesmore

UI(DEVIATION CHARGES) for the WEEK NO.20 (2017-18) from 14/08/2017 to 20/08/2017 REV-1 has been uploaded.more

Due to inadvertent error in Drawl of MUPL for dtd 09.10.17, SLDC No: SLDC/Comm./UI/2017-18/OCT/Week28/REV0/371 Dtd 18.01.18 stands as cancelled & withdrawn. NEW:UI(DEVIATION CHARGES) for the WEEK NO.28 (2017-18) from 09/10/2017 to 15/10/2017 has been uploaded.more

Correction due to inadvertent error in injection of UNOSUGEN for dtd 18.10.17, SLDC No: SLDC/Comm./UI/2017-18/OCT/Week-29/REV0/375 dtd 19.01.18 stands as cancelled and withdrawn.NEW: UI(DEVIATION CHARGES) for the WEEK NO.29 (2017-18) from 16/10/2017 to 22/10/2017 has been uploaded. more

UI(DEVIATION CHARGES) for the WEEK NO.30 (2017-18) from 23/10/2017 to 29/10/2017 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.20 from dt.14.08.2017 to dt.20.08.2017 R0 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.21 from dt.21.08.2017 to dt.27.08.2017 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.31 (2017-18) from 30/10/2017 to 05/11/2017 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.22 from dt.28.08.2017 to dt.03.09.2017 R0 has been uploaded.more

Wind Energy Blocked of January-18 for following partiesmore

UI(DEVIATION CHARGES) for the WEEK NO.34 (2017-18) from 20/11/2017 to 26/11/2017 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.33 (2017-18) from 13/11/2017 to 19/11/2017 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.23 from dt.04.09.2017 to dt.10.09.2017 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.32 (2017-18) from 06/11/2017 to 12/11/2017 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.35 (2017-18) from 27/11/2017 to 03/12/2017 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.36 (2017-18) from 04/12/2017 to 10/12/2017 has been uploadedmore

UI(DEVIATION CHARGES) for the WEEK NO.37 (2017-18) from 11/12/2017 to 17/12/2017 has been uploadedmore

Reactive Energy Charges (REC) Account for the week No.24 from dt.11.09.2017 to dt.17.09.2017 R0 has been uploaded.more

Correction due to inadvertent error in Drawl of TAECo,TSECo,SLDC No:SLDC/Comm./UI/2017-18/NOV/Week 34/REV0/408 dtd 16.02.18 stands as cancelled and withdrawn.NEW:UI(DEVIATION CHARGES) for the WEEK NO.34 (2017-18) from 20/11/2017 to 26/11/2017 has been uploaded.more

Correction due to inadvertent error in Drawl of TSECo, Injection of Essar Oil, SUGEN, SLDC No:SLDC/Comm./UI/2017-18/NOV/Week-35/REV0/418 Dt. 20/02/2018 stands cancelled and withdrawn. NEW:UI(DEVIATION CHARGES) for the WEEK NO.35 (2017-18) from 27/11/2017 to 03/12/2017 has been uploaded.more

Reactive Energy Charges (REC) Account for the week No.25 from dt.18.09.2017 to dt.24.09.2017 R0 has been uploaded.more

UI(DEVIATION CHARGES) for the WEEK NO.38 (2017-18) from 18/12/2017 to 24/12/2017 has been uploaded.more

Important Message :

>> A workshop on "RE integration & system recovery procedure" was arranged by WRPC,Mumbai on dtd.22-23 Feb 2018. Momento of Appreciation was awarded to (1) SSNL (2) Ukai Hydro power plant (3) CLPIPL gas power plant for successfully conducting black start mock drill during the year 2017. Also, a shield was given to SLDC-Gujarat for sharing ideas and knowledge on backup SLDC operation and black start mock drill experience. View


>> List of defaulters for SLDC Charges (wind firms) Link


>> Gujarat State Load Dispatch Centre is acknowledged for "Innovation in improving the Efficiency of Load Despatch Centre" at the 18th Regulators & Policymakers Retreat 2017 on 28th October,2017. Link


>> EASS will be opened only through www.sldcguj.org from Date:-15th Oct 2017. All stake holders are requested to take a note.


>>  Guideline for data displayed on new EASS software and applicability of loss (es) thereofmore


>> Invoices for RTU rental charges for FY 2017-18 have been uploaded on SLDC website : Link


>> GO-LIVE : Scheduling and Energy Accounting Software ...more


>> GETCO GST Registration No. / Provisional ID: 24AABCG4029R2ZC


>> Documents are mandatory for energy certification ...more


Welcome to SLDC, Gujarat

The State Load Dispatch Center is the apex body to ensure integrated operation of the power system in the Gujarat. It is the strategic functional unit of Gujarat Energy Transmission Corporation Ltd., for discharging various functions specified under Section 32 of Indian Electricity Act 2003.

Section 32: Indian Electricity Act2003

The State Load Despatch Centre shall-

  • Be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;
  • Monitor grid operations
  • Keep accounts of the quantity of electricity transmitted through the State grid
  • Exercise supervision and control over the intra-state transmission system
  • Be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

Please contact sldcscada.getco@gmail.com for technical query related to Website Browsing, Downloading, Uploading.....etc.

Company Visiting Hours
16:00 To 18:00

Website Total Visits
21535230

Visitor Graph
Click & View

Website Last Updated
26-02-2018 06:38:53 AM